PROJECT PHASE
- Determination of the Exact Dimensions of Structures
- Hydraulic Design of Structures
- Making Static Reinforced Concrete Calculations of Structures
- Bed Arrangement
- Preparation of Solid (Final) Projects (Construction, Mechanical, Electrical and Architectural)
- Preparation of Application Projects (Civil, Mechanical, Electrical and Architectural)
- Preparation of Project Reports
- Preparation of Technical Specifications
- Cost Analysis
- Preparation of Quantity and Discovery Reports
- Preparation of Tender Documents
- 3D Design of Facilities
- Transfer of Projects to Geographic Information System (GIS)
Stream Reclamation Flood Protection
Every year, sediments carried by erosion flow into existing dams. The prevention of slope erosion and the prevention of sedimentary movements in the stream beds are carried out through stream improvement and flood protection projects. Project studies are prepared by the experienced staff of MGS Proje by the relevant national legislation and taking into account the international standards.
The services provided within the scope of stream improvement and flood protection projects are given below:
PRE-REVIEW – PLANNING PHASE
- Preparing a Preliminary Review Report
- Preparation of Soil Drainage Report
- Preparation of Hydrology Report
- Project Site Map Reception
- Conducting Geological, Geophysical and Hydrogeological Studies
- Determination of Structure Approximate Dimensions
- Preparation of Feasibility Report
- Planning Report Preparation
- Preparation of Master Plan
- Sediment Transport Studies
- Preparation of Earthquake Risk Analysis Reports
- Alternative Project and Optimization Studies
- Preparation of Preliminary Projects
- Calculation of Project Cost
- Making Economic Analysis