PROJECT PLANNING PHASE
- Determination of the Exact Sizes of the Structures
- Hydrological Designing of the Structures
- Static Reinforced Concrete Calculations of Structures
- Making Slope Stability Analyses
- Preparation of Solid (Final) Projects (Construction, Mechanical, Electrical and Architectural)
- Preparation of Implementation Projects (Construction, Mechanical, Electrical and Architectural)
- Preparation of Project Reports
- Preparation of Technical Specifications
- Performing the Cost Analyses
- Preparation of Quantity and Discovery Reports
- Preparation of Tender Documents
- Designing of the Facilities in 3 Dimension
Ash Storage Facilities
In thermal power plants, the ash formed as a result of burning coal is primarily recycled. In this context, volatile ash is recycled for use in various sectors such as cement, ready-made concrete, briquettes, fire bricks and industry. In the event that ash from thermal power plants cannot be evaluated economically, ash storage facilities are designed for the disposal and storage of waste ash without harming the environment. The services offered within the scope of the design of these facilities are as follows:
PRELIMINARY REVIEW – PLANNING PHASE
- Facility Location Selection Report Preparation
- Feasibility Report Preparation
- Alternative Project and Optimization Studies
- Determination of Structure Approximate Dimensions
- Preparation of Preliminary Projects
- Calculation of Project Cost
- Making Economic Analysis
- Project Site Map Acquisition
- Conducting and Reporting Geological, Geophysical and Hydrogeological Studies
- Material Research and Reporting